LS Power Operations Support Facility

Princetown, NY

2024
Completion Year
Special

LS Power Operations Support Facility

Size

14,600 sf

Project Schedule

Project Start = July 2023
Completion Date = September 2024

The LS Power Operations Support Facility is a brand new pre-engineered metal building with over 14,000 square feet of space. The building features a secure vestibule for visitors, a work space, meeting space, fully equipped kitchen and restrooms. The building also has a mezzanine area for storage, among other storage areas, and below that, a locker room complete with another restroom, shower area and washer and dryer. The warehouse portion of the building houses a multiple configurations of racking and shelving systems and several overhead door openings, one of those being a 40’ wide overhead bifold door. The building also features radiant heating throughout and an 80’ long trench drain for ease of maintenance in the warehouse space. The exterior of building includes a retention pond, parking spaces and covered outdoor storage.

 

Architect

Laberge Group

4 Computer Drive West

Albany NY 12205

Owner

LS Power Grid NY Corporation

16150 Main Circle Dr. Ste 310

Chesterfield MO 63017

Your Project, Our Priority. Construction Solutions Tailored to Your Vision.

We take pride in the way we build quality people and quality buildings, on the bedrock of trust, in all that we do!