Union Graduate College

Schenectady, NY

2009
Completion Year
Education

Union Graduate College​

Size

24,000 sf

Start Date

December 2007

Completion Date

September 2009

Special Distinctions

Soil Abatement Geothermal Heating/Cooling

The Union Graduate College’s new facility is a LEED Certified building that has united the schools of the college in one location for the first time in its history. Built on an old gas station site, the project experienced problems from the very start. MLB was faced with an unusual amount of contamination in the soils which delayed the project for more than a month. Once the soil was removed, the project proceeded with great efficiency. The three-story, 24,000 square-foot structure is a high-performance, sustainable design which reduces the College’s carbon footprint through geothermal heating/cooling, high efficiency lighting, and recycled building materials.

The project was scheduled to be completed on July 31, 2009 but, due to a number of change orders and the soil contamination, the actual substantial completion date was August 14, 2009. MLB was able to make up for the lost time in the beginning of the project through careful planning, team work and by readjusting our milestone dates.

The air quality of the job site was a major concern throughout this project. MLB needed to make sure that all materials were safe from moisture and contamination. Careful monitoring of this was completed throughout the project and all subcontractors were made aware of this important aspect. Many LEED elements were incorporated into the building and MLB had one employee dedicating 3/4 of his time to making sure that LEED was achieved.

In the future, the roof of the building will be used as an open-air laboratory where students can study solar panel technology and other renewable energy sources.